We carried out an Installation of a new Sludge drain pipeline.
We then imported and laid topsoil to all grass areas and carried out
seeding, wildflower seeding and Planting.
The entire site was then Fenced with Timber Palisade fencing.
The Car Park entrance got new entrance stone walls and planting. We
also installed an electric Security gate at the main entrance.
© 2025 TLC Oban. All rights reserved | Design by W3layouts | Re-Design by Busybee Webdesign.